[交流] 仿真误区2:Leaving analysis for the end

[复制链接]
发表于 2009-7-16 16:27:37 | 显示全部楼层 |阅读模式
Deborah A. Sadowski ,Mark R. Grabau
2 S" T9 ]0 l% wThere's a common misconception that performing a simulation study involves a sequence of steps (e.g., project definition, model formulation, verification, validation, analysis). To the contrary, all elements of a simulation project should be performed repeatedly throughout the effort,
- J0 q6 a" d& J4 r( xgrowing in scope as the model progresses.  " ?- t2 N% d+ C1 S3 U4 [$ c
In the traditional view, projects suffer from too strong a focus on the model (and perhaps the animation), so that after the inevitable delays and problems, there's no time left to run scenarios. Instead, the analyst is faced with a presentation deadline that's firm and little time to experi-1 T! U: \0 q: z
ment, analyze, or think.
; E$ y  _, {; Y' A6 A: ^* e8 \Instead, you should schedule the project in complete phases. Intermediate milestones, spaced no more than about two weeks apart in a medium to large project, should include specific goals for the model, animation, data, and analysis. By the time you reach the last 25% of your time on the project, you should have addressed the basic analysis issues of run length, warm-up time, etc. and should already have performed preliminary analysis on the model for a number of different scenarios.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|手机版|SimulWay 道于仿真   

GMT+8, 2024-5-17 11:51 , Processed in 0.012892 second(s), 14 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2017 Comsenz Inc.

快速回复 返回顶部 返回列表